Resources
Overview | Technical Reports | Resources
Mineral Resources for the project are whittle pit-constrained, Figure 1 1, using a combined mining and processing cost of $5.50 per tonne and metal selling prices of $1,300 per ounce gold and $16 per ounce silver. Table 1 1 lists the in Pit Measured, Indicated and Inferred Mineral Resources for the Project.
Sleeper Project Pit Constrained Mineral Resource Estimate
Measured | |||||
Indicated | |||||
Measured and Indicated | |||||
Inferred |
Source: (As Filed) Amended Technical Report and Preliminary Economic Assessment, September 2017
Note: Mineral resources are not mineral reserves and do not demonstrate economic viability. There is no certainty that all or any part of the mineral resource will be converted to mineral reserves. Quantity and grade are estimates and are rounded to reflect the fact that the resource estimate is an approximation.
Figure 1 1 E-W Section showing block model and $1,300 Au whittle Pit
For larger image click here