Mineral Resources for the project are whittle pit-constrained, Figure 1 1, using a combined mining and processing cost of $5.50 per tonne and metal selling prices of $1,300 per ounce gold and $16 per ounce silver. Table 1 1 lists the in Pit Measured, Indicated and Inferred Mineral Resources for the Project.

Sleeper Project Pit Constrained Mineral Resource Estimate

Classification
Tonnes (000’s)
Au Grade (g/t)
Au oz (000’s)
Ag Grade (g/t)
Ag oz (000’s)
Measured
209,464
0.35
2,354
3.2
21,823
Indicated
87,662
0.28
789
2.5
7,065
Measured and Indicated
297,126
0.33
3,143
3.0
28,888
Inferred
148,844
0.31
1,488
1.4
6,698

Source: (As Filed) Amended Technical Report and Preliminary Economic Assessment, September 2017

Note: Mineral resources are not mineral reserves and do not demonstrate economic viability. There is no certainty that all or any part of the mineral resource will be converted to mineral reserves. Quantity and grade are estimates and are rounded to reflect the fact that the resource estimate is an approximation.

Figure 1 1 E-W Section showing block model and $1,300 Au whittle Pit
Sleeper Resource Pit
For larger image click here
Sleeper Resource Pit.jpg